Called at 11pm with water coming through the kitchen ceiling. A plumber arrived in under an hour and stopped the leak.
Valve Replacement across the GTA
Seized shut-offs and main valves replaced with quarter-turn ball valves.
Signs you need this
Worth a look before it becomes a bigger repair.
- Shut-off valve will not turn
- Valve weeps when closed
- No isolation valve at a fixture
- Main shut-off is old and seized
What we do
The work you are paying for.
- 1Isolate the section safely
- 2Replace with quarter-turn ball valves
- 3Add isolation valves where they are missing
- 4Test each valve holds fully closed
Related services
Leak Detection
Hidden leaks pinpointed acoustically and thermally, before they wreck your drywall.
1–3 hours
Water Quality Testing
Hardness, iron, pH and bacteria tested, with the results explained in plain English.
45–90 min
Water Heater Repair
No hot water, not enough, or a leaking tank — diagnosed and repaired same day.
1–3 hours
Water Heater Installation
New tank sized, installed and safely vented.
Half day
Tankless Water Heater
Endless hot water, smaller footprint, with gas and venting upgraded properly.
1 dayBook valve replacement
Send a few details and we call you back. For anything urgent, calling is fastest.
Valve Replacement — questions, answered
How quickly can you get to me for valve replacement?
What does valve replacement cost?
Is the work guaranteed?
Which areas do you cover?
Is the work guaranteed?
What customers say
Flat price up front and they stuck to it. New water heater installed the same afternoon I called.
Main drain backing up into the basement. They cleared it, camera-checked the line, and left it spotless.